Free Consultation
Request Your Free Concrete Estimate
Tell us about your project and we'll come out, assess the site properly, and put a written number in front of you. No cost, no obligation.
Same-day response
Requests submitted during business hours are typically answered the same day — usually within a couple of hours.
Written, itemised scope
You get the work written down with a fixed price, not a verbal number that drifts once the job starts.
No obligation, no pressure
We'll tell you honestly if a repair beats a replacement — even when that means a smaller job for us.
Typical project timelines
- Driveway replacement3–5 days7 days to drive on
- Patio or walkway2–4 days24–48 hrs to walk on
- Stamped / decorative4–7 daysSealed after 28 days
- Repair & resurfacing1–3 days24–72 hrs
- Commercial flatworkPhased to your operationBy section
On-site working days, excluding permit lead time. Concrete keeps gaining strength for 28 days after the pour.
Step 1 of 3
Takes about 2 minutes
Your details
So we know who we're talking to and how to reach you.
What Happens After You Submit
No mystery, no chasing. Here's exactly how the process runs from here.
We review your request
Your details go straight to the estimating team. If anything's unclear we'll come back with a couple of quick questions.
We schedule a site visit
We arrange a time that works for you and walk the site together — usually 20 to 30 minutes for a residential project.
You get a written estimate
A written scope and fixed price, with finish and material options laid out so you can compare properly.
You decide, in your own time
No pressure and no expiring discounts. When you're ready, we schedule the work and confirm the timeline.
What Helps Us Quote Accurately
None of this is required — send what you have. But the more of it we know up front, the closer the first number is to the final one.
Useful to include
- Rough dimensions, even paced out
- Photos of the existing surface and its worst areas
- Whether anything heavy parks on it — RV, trailer, delivery truck
- Where water currently pools after rain
- Any finish or colour you already have in mind
- Whether access is tight for a truck or pump
We'll work out on site
- Base condition and how much has to come out
- Required slab thickness and reinforcement
- Drainage and fall corrections
- Joint layout and where cracks should be directed
- Permit requirements for your city
- Realistic scheduling around curing time
How to Compare Concrete Quotes
Two quotes for the same job can differ by thousands, and it's rarely because one contractor is greedy. It's usually because they're quoting different work. Here's what to check.
A quote you can rely on
- States slab thickness in inches
- Names the mix strength in PSI
- Specifies reinforcement type and spacing
- Says how deep the base is and that it's compacted
- Includes demolition and haul-away as a line
- Covers permits, or says clearly that they're excluded
- Describes the finish and the sealer by name
- Puts the workmanship warranty in writing
A quote to ask questions about
- A single square-foot price with no specification
- No mention of what happens to the old concrete
- Silence on base preparation
- "Wire mesh" with no depth or placement detail
- A verbal number, or one that expires this week
- Large deposit requested before any work starts
- No licence number and no proof of insurance
- No written warranty of any kind
Estimate Questions
Our Commitment
What You Get When You Hire Us
The things we put in writing, not just on a website.
Workmanship Warranty
Our work is backed by a written workmanship warranty. If something isn't right because of how we built it, we come back and make it right.
Licensed & Fully Insured
General liability and workers' compensation coverage on every job, so you're never exposed to risk from work happening on your property.
Written Estimates, Fixed Scope
You get a written scope and price before anything starts. No verbal quotes, no moving numbers halfway through a project.
Site Left Clean
Debris hauled away, forms removed, and the surrounding area cleaned before we consider a job finished.

